Now available: Public summary of result D2.3.4 - Econ. Baseline study | ||
January 31st, 2011 | ||
Within the project CESAR under the Seventh Framework Programme of the European Commission Work Package 2 aims at process integration between all the elements of the power plant equipped with CO2 capture (boiler, turbine, CO2 capture, CO2 compression), using as a starting point the achievements of the CASTOR project. The ultimate aim of this work is to provide the technical and economic analysis of benchmark and advanced CO2 capture processes. The six selected baseline cases for investigation are: • Natural gas-fired 430 MWe Combined Cycle Gas Turbine plant • Advanced Supercritical(ASC) Bituminous coal-fired 800 MWe PF plant New Build • Advanced Supercritical(ASC) Bituminous coal-fired 800 MWe PF plant Retrofit • Bituminous coal-fired 600 MWe Combined heat and power plant (CHP) • Lignite-fired 1000 MWe PF plant • Lignite-fired 380 MWe PF plant For the full summary, read the pdf document CESAR-D2.3.4-APPROVED |
||
« Back to the news overview |